Industrial Installation Guide

Guide Content

3. Install the Gateways

  • Using zip ties, magnets, screws or adhesive, mount the Gateway in the desired location. Devices can be linked to multiple Gateways in installations (for example, when a device is being relocated)
  • Check the dashboard to confirm the Gateway is online
  • Verify the “Last KA” (Keep Alive) timestamp is updating
  • If using deployment mode, allow up to 3 hours for initial setup
    • Deployment mode requires power-cycling the device after choosing this mode on the dashboard
    • If you are not certified to open devices, please contact support@atomation.net or your account manager